High Precision Cost Estimating & Architectural Outputs
Our estimating team converts digital construction drawings into detailed material schedules and accurate cost estimates, following Australian industry standards and best practices.
#QTY
Average Duration24-48 Hours
Core SoftwaresPlanSwift, Bluebeam Revu
Quantity Take-Off & Material BOQs
Granular material quantities cataloging. We organise every dimension from structural concrete cubic metres to single trim screws with clear and accurate material categorisation.
Organised in direct CSV or Excel formats ready for local supplier bidding
Itemised structural rebar and steel tonnage schedules included
Geotechnical excavation and grading volume estimates
#MEP
Average Duration48-72 Hours
Core SoftwaresPlanSwift, Bluebeam Revu
MEP & HVAC Trades Cost Estimation
Trade-specific costing covering mechanical piping, electrical wire lengths, sub-panels, conduit schedules, plumbing fixtures, and local fire sprinkler density counts.
HVAC ductwork fabrication material indexing
Structural power and low-voltage electrical takeoffs
Plumbing wet-utility riser diagrams measurement
#TENDERBID
Average Duration3-5 Days
Core SoftwaresPlanSwift, Bluebeam Revu
Tender & Bid Estimates
End-to-end bid estimating including detailed tender preparation, competitive pricing strategy, and full risk-based cost breakdowns. We help you submit competitive, profitable bids.
Detailed construction bid level cost estimates and BOQ compliance
Contingency cost estimation and comprehensive risk-based analysis
Proposal support including tender documentation and bid planning
#MAINT
Average Duration3 Days
Core SoftwaresPlanSwift, Bluebeam Revu
Cleaning & Maintenance Cost Forecasters
Life-cycle costing forecasting showing projected utilities, operational overhead, structure degradation, and maintenance reserves across 25-50 year holding schemas.
OpEx and CapEx future valuation depreciation charts
Facility system replacement schedule projections
Green energy-efficient cost saving analysis comparison
Need customized takeoff schedules aligned to a complex project specification?